Energy & petroleum maritime operations

Bangladesh runs on imported petroleum products. Tankers deliver them to Chattogram's outer anchorage, with lighter tankers and oil berths beyond. For suppliers and traders, every delivery runs against fixed laytime, and an hour lost at the anchorage or the berth becomes demurrage. AMS gives tanker operators, suppliers, charterers and traders a local desk that watches that clock from nomination to final documents.

≈7.4 Mtnational fuel demand, FY2025–26BPC, as reported
≈1.5 Mt/yrcapacity of the state refinerythe rest arrives refined
½ tender · ½ G2Ghow BPC typically buys refined productsin Jan–Jun and Jul–Dec programmes
120 hlaytime for a 30,000 MT gasoil cargorecent BPC tender, incl. lightering
ProductsGasoil · Jet A-1 · HSFO · Gasoline · Marine fuels
Typical vesselsSmall tankers and MR product tankers
Where we workOuter anchorage, lighter tankers and oil berths
Our focusLaytime, demurrage and accurate reporting

Typical BPC cargoes and laytime

ProductFull cargoLaytime allowedDelivery
Gasoil 50 ppm (or + Jet A-1)30,000 MT (10,000 + 20,000 combination)120 running hours, FHINCOuter anchorage, lightering to oil berth at seller's cost
HSFO 180 cSt25,000 MT ±10%108 running hours, FHINCVessel must come direct to jetty
Gasoline 95 unleaded25,000 MT ±10%108 running hours, FHINCVessel must come direct to jetty
Marine fuel 0.5% S15,000 MT ±10%84 running hours, FHINCVessel must come direct to jetty

From a recent BPC international tender schedule. Berth draft at Chattogram oil berths is quoted there as 7–9 m, with LOA up to 186 m and a minimum discharge capacity of 700 MT per hour. Terms vary by tender.

Clean and dirty products

CategoryProductsWhat it means for the port call
Clean productsGasoline, Jet A-1, GasoilTank cleanliness and quality inspection matter most, and buyers look at the vessel's last three cargoes. These products usually discharge faster.
Dirty productsHSFO, fuel oilHeating is needed to keep the product pumpable. Discharge is slower and stripping takes longer, so plan the call around it.

Where demurrage is won or lost

Risk pointWhat we do about it
NOR windowAt Chattogram outer anchorage a BPC NOR counts only between 06:00 and 18:00. We time the arrival and tender NOR when the window opens.
Night navigationIf lightering cannot start on arrival because of the night navigation restriction, laytime waits until 06:00. We plan lighter tankers so the first hose connects at first light.
Shore rate restrictionsTerminal limits on rate and pressure confirmed before arrival, so the estimate is realistic.
Weather and tideStoppages for bad weather and low tide are excluded or counted at 50%, so we log every stoppage in the SOF.
Quantity and qualityThe ship arrival figure is fixed by the independent inspector at the anchorage. We make sure tanks, ullages and samples are ready for the inspector.
DocumentationCargo documents, survey reports and port papers prepared ahead of arrival.

Before arrival, we ask the vessel

  • Number and type of cargo pumps (deepwell or pump-room)
  • Maximum discharge rate and pressure
  • Manifold size and connections
  • Cargo tank plan and ullages on arrival
  • Heating temperature for HSFO / fuel oil
  • Stripping pump capacity
  • Arrival draft and trim
  • Bunker ROB for the expected waiting time

Estimate the discharge

Try a typical BPC cargo:
Interactive tool

Discharge time estimator

A quick, indicative estimate of how long a tanker will take to discharge. This is the same first check our desk runs when a nomination arrives.

Volume–
Working rate–
Pumping time–
Estimated total–

Indicative only. Actual discharge depends on shore pressure and line restrictions, cargo viscosity and heating, number of grades, weather and terminal procedures. Send us the vessel's Q88 and cargo plan for a proper estimate.

Documents we track

Notice of ReadinessUllage reportsPumping logStatement of FactsTanker discharge report / time sheetCertificate of quantity & qualityBill of Lading & cargo docsROB bunker survey

Tanker terms, in brief

Ullage
The empty space above the cargo in a tank, measured from the top. Ullages before and after discharge show how much has gone ashore.
Ship arrival figure
The quantity on board measured by the independent inspector on arrival at the outer anchorage. BPC uses it as the invoice quantity.
NOR
Notice of Readiness. The master's notice that the vessel has arrived and is ready to discharge.
FHINC
Fridays and holidays included: laytime runs every day.
Laytime
The time allowed in the contract to discharge the cargo.
Demurrage
The amount payable for time used beyond laytime.
Stripping
Pumping out the last cargo from the tank bottoms at a slower rate at the end of discharge.
CFR
Cost and Freight. The seller supplies the cargo and arranges the vessel to the discharge port.
Bidding for a BPC package? See our Government Tender Desk for the full set of delivery terms.